Determination Of Run Off Of A Watershed In Michael Okpara University Of Agriculture Umudike For The Design Of College Of' Engineering And Engineering Technology (CEET) Drainage Channel And Culvert

UGOANI ANTHONY | 56 pages (8269 words) | Projects

ABSTRACT

Runoff is that portion of the precipitation or rainfall that finds its way towards the stream channels rivers, lashes or oceans as surface or subsurface flow. It is also the total lwei of water obtained after water infiltration, interception, surface storage arid other losses have been subtracted or deducted from the total dept. of precipitation (Potter, 1961). Tent. epitomic b vegetated canopy maybe so great as to prevent a light rain stone from watering the soil. Interception by dense covers of forest or shrubs cursorily alimony. o 25 peronei of arousal precipitations, interception also has a detection storage ef1':et, delaying the prognoses of precipitation that reaches the front the leaves. Runoff will occur only when the rate f precipitator raced the rate at which water infiltrates into the soil. After the infiltration i.e satisfied, water begins to fill the depressions, ; d and large on the soil surface, as the depressions are filled, overland flows beg. risk. The depth of tier bu1ds up on the surface. Until it is sufficient to result in r.in ff, in equhbriuni wit the of precipitation less infiltration and interception (Couple, e ai., 1 94.4).

Overall Rating

0.0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

UGOANI, A (2021). Determination Of Run Off Of A Watershed In Michael Okpara University Of Agriculture Umudike For The Design Of College Of' Engineering And Engineering Technology (CEET) Drainage Channel And Culvert . Repository.mouau.edu.ng: Retrieved Dec 22, 2024, from https://repository.mouau.edu.ng/work/view/determination-of-run-off-of-a-watershed-in-michael-okpara-university-of-agriculture-umudike-for-the-design-of-college-of-engineering-and-engineering-technology-ceet-drainage-channel-and-culvert-7-2

MLA 8th

ANTHONY, UGOANI. "Determination Of Run Off Of A Watershed In Michael Okpara University Of Agriculture Umudike For The Design Of College Of' Engineering And Engineering Technology (CEET) Drainage Channel And Culvert " Repository.mouau.edu.ng. Repository.mouau.edu.ng, 05 Jul. 2021, https://repository.mouau.edu.ng/work/view/determination-of-run-off-of-a-watershed-in-michael-okpara-university-of-agriculture-umudike-for-the-design-of-college-of-engineering-and-engineering-technology-ceet-drainage-channel-and-culvert-7-2. Accessed 22 Dec. 2024.

MLA7

ANTHONY, UGOANI. "Determination Of Run Off Of A Watershed In Michael Okpara University Of Agriculture Umudike For The Design Of College Of' Engineering And Engineering Technology (CEET) Drainage Channel And Culvert ". Repository.mouau.edu.ng, Repository.mouau.edu.ng, 05 Jul. 2021. Web. 22 Dec. 2024. < https://repository.mouau.edu.ng/work/view/determination-of-run-off-of-a-watershed-in-michael-okpara-university-of-agriculture-umudike-for-the-design-of-college-of-engineering-and-engineering-technology-ceet-drainage-channel-and-culvert-7-2 >.

Chicago

ANTHONY, UGOANI. "Determination Of Run Off Of A Watershed In Michael Okpara University Of Agriculture Umudike For The Design Of College Of' Engineering And Engineering Technology (CEET) Drainage Channel And Culvert " Repository.mouau.edu.ng (2021). Accessed 22 Dec. 2024. https://repository.mouau.edu.ng/work/view/determination-of-run-off-of-a-watershed-in-michael-okpara-university-of-agriculture-umudike-for-the-design-of-college-of-engineering-and-engineering-technology-ceet-drainage-channel-and-culvert-7-2

Related Works
Please wait...