Time Series Analysis On The Consumption Of Monthly Electric Power In Millions Of KWH In NRCRI 2001-2005

DIKE HELINA NLEMCHI | 50 pages (7646 words) | Projects

ABSTRACT

This project work studies on the Electric power energy consumed by NRCRI 200 1-2007 the ultimate aim is to design a mathematical model that could be used to obtain a reliabl&1 estimate of energy consumed the method of simple descriptive series analysis was used. The trend was moving upward there was a seasonal effect to. The trend and the seasonal component were use to forecast.

Overall Rating

0.0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

DIKE, N (2021). Time Series Analysis On The Consumption Of Monthly Electric Power In Millions Of KWH In NRCRI 2001-2005. Repository.mouau.edu.ng: Retrieved Nov 22, 2024, from https://repository.mouau.edu.ng/work/view/time-series-analysis-on-the-consumption-of-monthly-electric-power-in-millions-of-kwh-in-nrcri-2001-2005-7-2

MLA 8th

NLEMCHI, DIKE. "Time Series Analysis On The Consumption Of Monthly Electric Power In Millions Of KWH In NRCRI 2001-2005" Repository.mouau.edu.ng. Repository.mouau.edu.ng, 15 Jul. 2021, https://repository.mouau.edu.ng/work/view/time-series-analysis-on-the-consumption-of-monthly-electric-power-in-millions-of-kwh-in-nrcri-2001-2005-7-2. Accessed 22 Nov. 2024.

MLA7

NLEMCHI, DIKE. "Time Series Analysis On The Consumption Of Monthly Electric Power In Millions Of KWH In NRCRI 2001-2005". Repository.mouau.edu.ng, Repository.mouau.edu.ng, 15 Jul. 2021. Web. 22 Nov. 2024. < https://repository.mouau.edu.ng/work/view/time-series-analysis-on-the-consumption-of-monthly-electric-power-in-millions-of-kwh-in-nrcri-2001-2005-7-2 >.

Chicago

NLEMCHI, DIKE. "Time Series Analysis On The Consumption Of Monthly Electric Power In Millions Of KWH In NRCRI 2001-2005" Repository.mouau.edu.ng (2021). Accessed 22 Nov. 2024. https://repository.mouau.edu.ng/work/view/time-series-analysis-on-the-consumption-of-monthly-electric-power-in-millions-of-kwh-in-nrcri-2001-2005-7-2

Related Works
Please wait...