ABSTRACT
This investigation on application
of quality control in Omo Multi Active was carried out in Unilever Nigeria Plc,
Aba. It was made up of ten (10) selected samples at a regular interval of two
hours. Decision on accessing particular sampling plan was made using quality
control charts (i.e. chart R-chart) p-chart, C-chart and operating
characteristics function (O.0 curve). The aim of this work is to use
statistical control tools such as the aforementioned to assess the conformity
of product, Omo Multi Active to the set standard. Making use of X chart and R-
chart in the first table, one samp'e each was out of control. During the second
check it was observed that all the remnant samples were in statistical control.
In the second table. Making use of O.C. curve, P —chart and C-chart it was
observed that the quality of Omo produced met the required standard.
UEGBULEM, N (2021). Application Of Quality Control In Omo Multi Active (A Case Study Of Unilever Nigeria Plc). Repository.mouau.edu.ng: Retrieved Nov 01, 2024, from https://repository.mouau.edu.ng/work/view/application-of-quality-control-in-omo-multi-active-a-case-study-of-unilever-nigeria-plc-7-2
NNAEM, UEGBULEM. "Application Of Quality Control In Omo Multi Active (A Case Study Of Unilever Nigeria Plc)" Repository.mouau.edu.ng. Repository.mouau.edu.ng, 11 Aug. 2021, https://repository.mouau.edu.ng/work/view/application-of-quality-control-in-omo-multi-active-a-case-study-of-unilever-nigeria-plc-7-2. Accessed 01 Nov. 2024.
NNAEM, UEGBULEM. "Application Of Quality Control In Omo Multi Active (A Case Study Of Unilever Nigeria Plc)". Repository.mouau.edu.ng, Repository.mouau.edu.ng, 11 Aug. 2021. Web. 01 Nov. 2024. < https://repository.mouau.edu.ng/work/view/application-of-quality-control-in-omo-multi-active-a-case-study-of-unilever-nigeria-plc-7-2 >.
NNAEM, UEGBULEM. "Application Of Quality Control In Omo Multi Active (A Case Study Of Unilever Nigeria Plc)" Repository.mouau.edu.ng (2021). Accessed 01 Nov. 2024. https://repository.mouau.edu.ng/work/view/application-of-quality-control-in-omo-multi-active-a-case-study-of-unilever-nigeria-plc-7-2